Power Take Off Installation

Preparation Do not disengage the clutch before conducting the power take off installation on the engine. Disengagement allows the clutch plates to slip out of the correctly aligned positions. If the facings have become misaligned, they may be realigned by using the drive ring as a gauge. Flywheel and Flywheel Housing Alignment Checks It is strongly recommended that the dial indicator checks be made prior to installation of the PTO,…